Powell River Trades Facility
3960 Selkirk Avenue, Powell River, BC V8A 3C6
Project Status: DESIGN - Scope:
To relocate the existing Carpentry and Automotive programs to a new stand-alone building on the Main Powell River Campus.
|
MILESTONES
PROJECT SCHEDULE (click to enlarge)
PROPOSED FACILITY- Design
CONCEPTUAL DESIGN INFORMATION
FILE NAME |
DATE |
DOCUMENT |
| Schematic Design | March 2010 | |
| Preliminary Plans | April 2009 | |
| Infrastructure Grant Application | March 2009 | |
| Project Summary | November 2008 | |
| Area Summary - Existing & Proposed | August 2008 |
REPORTS
FILE NAME |
DATE |
DOCUMENT |
| Geotechnical Report - Lewkowich Engineering | November 2008 | |
| BC Building Code Review - Combustible/Non-combustible | May 2008 |
PROJECT TEAM
| Geotechnical Engineer | Lewkowich Engineering Associates Ltd. |
| Design / CRP | Herold Engineering Ltd. |
| Structural | Herold Engineering Ltd. |
| Civil | Herold Engineering Ltd. |
| Mechanical | Avalon Mechanical Consultants Ltd. |
| Electrical | Applied Engineering Solutions Ltd. |
| Cost Consultant | Beacon Construction Consultants Inc. |
| Commissioning Agent | TBD |