Skip to main content - Skip to contact information

Design InformationShq'apthut Logo

 

 

 

 

 

Shop Drawing Status Report

Shop Drawing Log

Construction Drawings and Addendums

1. Architectural
  1.1 Drawings PHASE I 2009-06-17
  1.2 Architectural Details Book PHASE I 2009-06-17
2. Electrical
  2.1 Drawings PHASE I 2009-06-17
3. Mechanical
  3.1 Drawings PHASE I 2009-06-17
4. Structural
  4.1 Drawings PHASE I 2009-06-17
5. Civil
  5.1 Drawings PHASE I 2009-06-17
6. Addendums
  Addendum List 2010-01-13
  6.1 Addenda 01 PHASE I 2009-09-16
  6.2 Addenda 02 PHASE I 2009-09-16
  6.3 Addenda 03 PHASE I 2009-11-25
  6.4 Addenda 04 PHASE I 2009-11-25
  6.5 Addenda 05 PHASE I 2009-11-26
  6.6 Addenda 06 PHASE I 2009-12-01
  6.7 Addenda 07 PHASE I 2009-12-02
  6.8 Addenda 08 PHASE I 2009-12-04
  6.9 Addenda 09 PHASE I 2009-12-09
7. Specifications
  7.1 Complete Construction Specifications 2009-09-17

 

 

Schematic Drawings & Information (most recent at top)

Design Development Drawings & Information

Conceptual Design Drawings & Information (most recent at top)